revnock.

You’re previewing Anchor Foundation — a sample business built on RevNock. Everything here works.

Start with 45 days freeOwner’s view
Owner’s view:Market intelligence Start with 45 days free Starting at $3,000/month
Back to the journalAnchor Foundation journal / Editorial theme

A repair scope you can understand

Investigation, engineering and written inclusions before any repair proposal.

A proposal from Anchor is written to be compared: scope, allowances and schedule, each on its own line.

How a proposal is built.

We separate the scope from the allowances and the schedule, so you can see what a figure buys and what would move it. Permits, engineering and inspections are listed where they apply, never folded into a number you cannot check.

A FOUNDATION REPAIR PLANNING CHECKLIST
  1. Which items are allowances, and what happens when a selection exceeds one?
  2. How are permits, engineering and inspections shown in the proposal?
  3. What would change the price after the contract is signed?

Put this perspective into practice.

Each guide below covers what the service involves and the questions worth bringing to your site assessment.

Repair approaches

Pier & underpinning planning

Steel push piers and helical piers driven to load-bearing strata, with engineering and a transferable warranty.

  • What should the site assessment and written scope establish for pier & underpinning planning?
  • Which site observations, drainage history and movement records justify further investigation or independent engineering?
  • What assessed cause, engineered scope, monitoring plan, exclusions and warranty limits support the proposed repair?
Read the full guide
Repair approaches

Slab repair assessment

Assessment and repair of cracked or settled slabs, with polyurethane lifting where it fits and honesty about where it does not.

  • What should the site assessment and written scope establish for slab repair assessment?
  • Which site observations, drainage history and movement records justify further investigation or independent engineering?
  • What assessed cause, engineered scope, monitoring plan, exclusions and warranty limits support the proposed repair?
Read the full guide
Site considerations

Drainage & moisture planning

Grading, French drains, downspout extensions and sump systems that keep water away from the foundation.

  • What should the site assessment and written scope establish for drainage & moisture planning?
  • Which site observations, drainage history and movement records justify further investigation or independent engineering?
  • What assessed cause, engineered scope, monitoring plan, exclusions and warranty limits support the proposed repair?
Read the full guide

Manufacturer and product names belong to their owners and link to official information. No affiliation or authorized-provider status is implied.

More from the journal

Keep reading.