How it works.
What to expect, start to finish.
Your roof assessment covers condition, access, structure, ventilation and local code; we confirm scope, materials, permits, warranty terms and a written estimate before any work is scheduled.
Your project, step by step
- Before
Tell us what prompted the visit when you book. We confirm by text and arrive with everything we need to measure, test and photograph.
- During
We look at everything that matters, explain what we find as we go and answer every question on the spot. There is no charge and no obligation.
- After
Within two business days you receive a written summary with photos, your options and a price range for each. Nothing is scheduled until you decide.
Know the names.
The makers, products and standards we reference at a leak & repair assessment.
Daylight, beautifully detailed
We suggest VELUX Solar Powered Fresh Air skylights while the roof is already open. A well-placed opening can reshape a room, provided the flashing and interior shaft are designed together.
- Study room layout and sun exposure
- Coordinate the correct flashing for the roof
- Discuss rain sensing, shades and interior finishing
Manufacturer and product names belong to their owners and link to official information. No affiliation or authorized-provider status is implied.
Good to know.
How long does the work take?
The site visit itself takes about 60 minutes. If it leads to work, your written summary includes a schedule for each option.
Do you handle permits and engineering?
Yes. When the work that follows needs a permit or an engineer’s sign-off, we prepare the drawings, pull the permits and book the inspections.
What happens after the assessment?
Within two business days you receive a written summary with photos, your options and a price range for each. Nothing is scheduled until you decide.
Questions worth bringing.
- What should the site assessment and written scope establish for leak & repair assessment?
- How will the contractor assess decking, flashing, ventilation and possible water-entry sources?
- Which tear-off, disposal, permits, repair allowances and workmanship versus manufacturer warranties are specified?
Before you book.
Every project starts on site. You receive a written scope, a schedule and a price range before design begins, and nothing moves to contract until you approve it. Final scope and pricing are confirmed after your site assessment.
“The leak & repair assessment found a flashing problem two other companies missed. Fixed that week, photos included.”

