revnock.

You’re previewing Steady Power — a sample business built on RevNock. Everything here works.

Start with 45 days freeOwner’s view
Owner’s view:Market intelligence Start with 45 days free Starting at $3,000/month
Back to all servicesInstallation planning / THE PROJECT GUIDE

Automatic transfer switchesA more informed beginning.

Automatic transfer switches that move your home to generator power within seconds and back when the utility returns.

Price
From $1,850
Site visit
60 min
Book a site assessmentQuestions first? Text us at (813) 555-0135
A modern white villa with a pool terrace at midday at Steady Power
Serving the Tampa metro · Mon–Fri 8–5 · Sat by appointment
THE DETAILS

How it works.
What to expect, start to finish.

Our electrician assesses your electrical loads, fuel supply, placement and local code; sizing, clearances, permits and installation follow code and the manufacturer’s instructions, and a standby system covers the circuits you choose for as long as its fuel lasts.

Your project, step by step

  1. Before

    We measure on site, talk through what you need and send a written quote with product options within two business days.

  2. During

    Installation is booked in a window that suits you. Our crew protects your home, works cleanly and talks you through anything that changes on the day.

  3. After

    We show you the finished work, hand over the care notes and any warranties, and stay a text away for anything that comes up.

Know the names.

The makers, products and standards we reference when we talk about automatic transfer switches.

LOADS BEFORE KILOWATTS

Power for the essential evening

Cummins QuietConnect is one of our standby references while we map the home’s actual priorities. Well pumps, air conditioning and kitchen equipment create different starting and running demands.

  • List essential circuits and motor-starting needs
  • Review fuel supply and automatic transfer options
  • Coordinate placement, clearances and local approval
Cummins · QuietConnect series

Manufacturer and product names belong to their owners and link to official information. No affiliation or authorized-provider status is implied.

Good to know.

How long does the work take?

Your written quote states the schedule for automatic transfer switches. Most installs are finished in a day or two, and we confirm the arrival window by text the day before.

Do you handle permits and engineering?

Yes, whenever the work needs a permit. We pull it and book the inspection, and both are on your quote before anything is scheduled.

What happens after the assessment?

Within two business days you receive a written quote with product options and a schedule. Nothing is ordered until you approve it.

Questions worth bringing.

  • What should the site assessment and written scope establish for automatic transfer switches?
  • Which assessed household loads, fuel arrangements and site clearances determine system sizing and placement?
  • What transfer equipment, permits, commissioning, servicing and manufacturer limitations will the installer document?

Before you book.

Every project starts on site. You receive a written scope, a schedule and a price range before design begins, and nothing moves to contract until you approve it. Final scope and pricing are confirmed after your site assessment.

“Automatic transfer switches installed with the generator in one visit. Permits and the gas line were handled for us.”
Ana L. · Client review