How it works.
What to expect, start to finish.
Our electrician assesses your electrical loads, fuel supply, placement and local code; sizing, clearances, permits and installation follow code and the manufacturer’s instructions, and a standby system covers the circuits you choose for as long as its fuel lasts.
Your project, step by step
- Before
Tell us what prompted the visit when you book. We confirm by text and arrive with everything we need to measure, test and photograph.
- During
We look at everything that matters, explain what we find as we go and answer every question on the spot. There is no charge and no obligation.
- After
Within two business days you receive a written summary with photos, your options and a price range for each. Nothing is scheduled until you decide.
Know the names.
The makers, products and standards we reference when we talk about fuel & placement planning.
The readiness calendar
A generator earns its place through ongoing readiness. We pair Mobile Link status reporting with a documented exercise, fuel and maintenance plan tailored to the installed unit.
- Explain exercise versus a load-transfer test
- Record responsible service contacts and intervals
- Walk through alerts, fuel monitoring options and escalation
Manufacturer and product names belong to their owners and link to official information. No affiliation or authorized-provider status is implied.
Good to know.
How long does the work take?
The site visit itself takes about 60 minutes. If it leads to work, your written summary includes a schedule for each option.
Do you handle permits and engineering?
Yes. When the work that follows needs a permit or an engineer’s sign-off, we prepare the drawings, pull the permits and book the inspections.
What happens after the assessment?
Within two business days you receive a written summary with photos, your options and a price range for each. Nothing is scheduled until you decide.
Questions worth bringing.
- What should the site assessment and written scope establish for fuel & placement planning?
- Which assessed household loads, fuel arrangements and site clearances determine system sizing and placement?
- What transfer equipment, permits, commissioning, servicing and manufacturer limitations will the installer document?
Before you book.
Every project starts on site. You receive a written scope, a schedule and a price range before design begins, and nothing moves to contract until you approve it. Final scope and pricing are confirmed after your site assessment.

