How it works.
What to expect, start to finish.
Your solar assessment reviews usage, roof condition, shading and electrical capacity; production estimates, interconnection, incentives and financing are modeled for your actual site, and savings depend on your usage and utility rates.
Your project, step by step
- Before
Tell us what prompted the visit when you book. We confirm by text and arrive with everything we need to measure, test and photograph.
- During
We look at everything that matters, explain what we find as we go and answer every question on the spot. There is no charge and no obligation.
- After
Within two business days you receive a written summary with photos, your options and a price range for each. Nothing is scheduled until you decide.
Know the names.
The makers, products and standards we reference when we talk about electrical panel planning.
The circuit-by-circuit home
SPAN Panel is our reference for monitoring and managing individual circuits. We map how EV charging, cooking, heat pumps and backup priorities fit into a whole-home electrical plan.
- Review service capacity with the electrician
- Assign priorities for an outage scenario
- Walk through monitoring and control at handover
Manufacturer and product names belong to their owners and link to official information. No affiliation or authorized-provider status is implied.
Good to know.
How long does the work take?
The site visit itself takes about 60 minutes. If it leads to work, your written summary includes a schedule for each option.
Do you handle permits and engineering?
Yes. When the work that follows needs a permit or an engineer’s sign-off, we prepare the drawings, pull the permits and book the inspections.
What happens after the assessment?
Within two business days you receive a written summary with photos, your options and a price range for each. Nothing is scheduled until you decide.
Questions worth bringing.
- What should the site assessment and written scope establish for electrical panel planning?
- How do roof condition, shading, usage and utility interconnection affect the proposed design?
- Which production assumptions, tariff terms, incentives, financing costs and battery limitations need independent verification?
Before you book.
Every project starts on site. You receive a written scope, a schedule and a price range before design begins, and nothing moves to contract until you approve it. Final scope and pricing are confirmed after your site assessment.

