How it works.
What to expect, start to finish.
Your solar assessment reviews usage, roof condition, shading and electrical capacity; production estimates, interconnection, incentives and financing are modeled for your actual site, and savings depend on your usage and utility rates.
Your project, step by step
- Before
We measure on site, talk through what you need and send a written quote with product options within two business days.
- During
Installation is booked in a window that suits you. Our crew protects your home, works cleanly and talks you through anything that changes on the day.
- After
We show you the finished work, hand over the care notes and any warranties, and stay a text away for anything that comes up.
Know the names.
The makers, products and standards we reference when we talk about EV charging integration.
The circuit-by-circuit home
SPAN Panel is our reference for monitoring and managing individual circuits. We map how EV charging, cooking, heat pumps and backup priorities fit into a whole-home electrical plan.
- Review service capacity with the electrician
- Assign priorities for an outage scenario
- Walk through monitoring and control at handover
Manufacturer and product names belong to their owners and link to official information. No affiliation or authorized-provider status is implied.
Good to know.
How long does the work take?
Your written quote states the schedule for EV charging integration. Most installs are finished in a day or two, and we confirm the arrival window by text the day before.
Do you handle permits and engineering?
Yes, whenever the work needs a permit. We pull it and book the inspection, and both are on your quote before anything is scheduled.
What happens after the assessment?
Within two business days you receive a written quote with product options and a schedule. Nothing is ordered until you approve it.
Questions worth bringing.
- What should the site assessment and written scope establish for EV charging integration?
- How do roof condition, shading, usage and utility interconnection affect the proposed design?
- Which production assumptions, tariff terms, incentives, financing costs and battery limitations need independent verification?
Before you book.
Every project starts on site. You receive a written scope, a schedule and a price range before design begins, and nothing moves to contract until you approve it. Final scope and pricing are confirmed after your site assessment.
“EV charging integration was planned with the panel upgrade so we never had to open the wall twice.”

