revnock.

You’re previewing Frame Kitchen & Bath — a sample business built on RevNock. Everything here works.

Start with 45 days freeOwner’s view
Owner’s view:Market intelligence Start with 45 days free Starting at $3,000/month
Back to all servicesBathroom spaces / THE PROJECT GUIDE

Primary bathroom renovationA more informed beginning.

Primary bathrooms with walk-in showers, freestanding tubs and storage designed around how you get ready.

Price
Projects from $22,500
Design visit
60 min
Book a design visitQuestions first? Text us at (813) 555-0133
A modern white villa with a pool terrace at midday at Frame Kitchen & Bath
the Design District showroom · Mon–Fri 8–5 · Sat by appointment
THE DETAILS

How it works.
What to expect, start to finish.

Your design visit reviews the existing room, the changes you want, site conditions and priorities; final scope, trade work, permits, lead times, selections and costs are set out in a written agreement before demolition day.

Your project, step by step

  1. Before

    We visit the site, measure, photograph and talk through what you want the work to do. You receive a written scope and a price range before anything is designed or ordered.

  2. During

    A named project manager runs the schedule, handles permits and inspections and keeps you posted with photos at every milestone.

  3. After

    We walk the finished work with you, hand over warranties and care notes and stay on call through the first season.

Know the names.

The makers, products and standards we reference when we talk about primary bathroom renovation.

KOHLER ANTHEM + STATEMENT

The considered shower ritual

We compose Anthem digital controls and Statement showering forms around an individual routine. Outlet selection, water delivery and plumbing capacity get the same attention as the finish palette.

  • Compare spray, handshower and control placement
  • Review valve access and hot-water capacity
  • Keep steam and digital options specific to the selected system
Kohler · Anthem and Statement showering

Manufacturer and product names belong to their owners and link to official information. No affiliation or authorized-provider status is implied.

Good to know.

How long does the work take?

It depends on scope. Your written proposal sets out the schedule for primary bathroom renovation, and your project manager keeps it current from the first day on site to the final walkthrough.

Do you handle permits and engineering?

Yes. Whenever the work needs them, we prepare the drawings, pull the permits and coordinate engineering and inspections, and your schedule shows every sign-off.

What happens after the assessment?

Within a few days you receive a written scope, a price range and a proposed schedule. Nothing moves to contract until you approve the plan.

Questions worth bringing.

  • What should the site assessment and written scope establish for primary bathroom renovation?
  • How will measurements, plumbing, electrical work and any structural changes shape the room layout?
  • Which selections, allowances, waterproofing details, permits and change-order steps are documented before work starts?

Before you book.

Every project starts on site. You receive a written scope, a schedule and a price range before design begins, and nothing moves to contract until you approve it. Final scope and pricing are confirmed after your site assessment.

“Primary bathroom renovation with every selection made in one showroom visit. Tile, fixtures and lighting all in hand.”
Nia K. · Client review